Photovoltaics

Glass-glass modules, built to outlast the loan

We install two Bauer Solar module lines, both glass-glass and both bifacial. A glass-glass module is protected on both faces, takes more mechanical load and ages more slowly than a glass-foil module. That is why the warranty runs 30 years instead of the 12 to 25 that are usual.

Bauer Solar photovoltaics
Bauer Solar

Two module lines

Both are all black with a black frame, so no silver or metallic edge is visible on the roof.

BS-96G12HBB-GG, glass-glass

Rated output460 to 470 Wp
Module efficiencyup to 23.5 per cent
Cell technologyN-type TOPCon, bifacial, 96 half-cells
ConstructionGlass-glass 2 mm / 2 mm, black frame, all black
Dimensions and weight1,762 × 1,134 × 30 mm, 24.0 kg
Bifacial gainup to 30 per cent
Warranty30 years product and performance, reinsured with Munich Re
Output after 30 yearsat least 87.4 per cent
CertificationIEC 61215, IEC 61730, fire class A, hail class HW3, up to 6,100 Pa

BS-108M10BCBT-GG, back contact

Rated output485 to 495 Wp
Module efficiencyup to 24.3 per cent
Cell technologyBack contact, bifacial, 108 half-cells
ConstructionGlass-glass 2 mm / 2 mm, black frame, all black
Bifacial gainup to 30 per cent, bifaciality 70 per cent
Warranty30 years product and performance
CertificationFire class A, hail class HW3, up to 5,400 Pa
How a project runs

Four steps, all of them ours

Planning, electrical design, grid registration and installation are separate departments in the same building. Nothing in this list is subcontracted per project.

1

Site survey first

We do not put a figure on paper before someone has seen the building. Roof structure, electrical situation and actual consumption decide what is sensible, and sometimes the answer is that nothing is.

2

Design in house

DC layout and AC layout are done by two separate departments of our own. Every system is calculated individually, module by module and string by string.

3

Grid registration

Registration and the commissioning notification are two separate filings, and every distribution grid operator in Germany runs its own procedure. Five people here work on nothing else. We issue the installer's declaration ourselves.

4

Installation and commissioning

Our own crews, split into DC, AC and heat pump teams, with our own warehouse and fleet behind them. After commissioning the system stays under remote monitoring.

The departments behind it

Questions about this equipment?

Call 05371 589 8857 or write to info@iee-solar.de. We answer in English.

Contact details